Group Meeting

  • solarsausageteam26
  • Apr 14, 2015
  • 1 min read

- finish building the infrastructure for the two sausage system

- test the entire system together at once

- water pasteurization section is failing

-first power output tests are low

- as we were able to perfect the focal point of the sausage the power output increased immediately

*****Our final system testing was done a week later and our final power output was 40W compared to the 10W we erroneously calculated during initial testing.


 
 
 